Objective
To improve the condition of the existing street parking, roadway, and public sidewalk. To improve pedestrian safety and accessibility under ADA requirements.
Description
The scope of work for this project is yet to be finalized. The design engineer is creating multiple alternatives for this project.
This project consists of roadway and sidewalk improvements to Park Boulevard between Ardmore Avenue and Cornell Avenue. The south side of the roadway has sidewalk between the back of curb and the front edge of several buildings. The existing sidewalk doesn’t meet ADA guidelines. This project will replace the sidewalk with ADA compliant sidewalk. This work will require replacement of the curb and gutter and the adjacent parking lane and possibly part of the roadway. The entire roadway and parking lane will be resurfaced at a minimum. Limits of reconstruction versus resurfacing will be based on design of south side sidewalk grading to meet ADA guidelines.
Justification
The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. Modernization of the sidewalk and street parking is needed to meet current ADA requirements and guidelines.
Bidding & Planholders Information
All requests for information or clarification shall be submitted to the Village of Villa Park by email to engineering@invillapark.com. All responses that are provided to requests for information or clarification will be provided through QuestCDN at https://www.questcdn.com.
The Village will accept requests for information or clarification submitted in accordance with the above requirements until the date and time specified in the Advertisement for Bids. Requests for information or clarification received after such time will not be accepted and will receive no response.