Harvard Avenue Improvement Project (Plymouth to Ridge)

General Information

Project Location(s):
North Harvard Avenue from Plymouth Street to Ridge Road
Project Status:
Bidding
Bid Opening Date:
Tuesday, April 15, 2025, at 10:00 a.m. CST
Mandatory Pre Bid Meeting:
No
QuestCDN Number:
9600456
Construction Start Date:
2025
Construction Completion Date:2025
Contractor:
TBD
Construction Engineer:
TBD
Design Engineer:
Christopher B. Burke Engineering, Ltd.
Awarded Contract Amount:
TBD
Adjusted Final Contract Amount:
TBD
Funding Source(s):
Street Referendum, Stormwater Fund, Water Supply Fund, Wastewater Fund

Objective

To improve the condition of the roadway by means of selected pavement rehabilitation methods. To improve the water system capacity and reliability by replacing the existing undersized water main.

Description

This project consists of improvements on North Harvard Avenue from Plymouth Street to Ridge Road. The project includes the replacement of the existing 4" watermain from Plymouth Street to Sunset Drive. The project also includes pavement removal, aggregate base course, Hot-Mix Asphalt Binder Course, Hot-Mix Asphalt Surface Course, curb and gutter installation, sidewalk removal and replacement, driveway pavement removal and replacement, adjusting sanitary services, storm sewer removal and replacement and parkway restoration.  

Justification

The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. The pavement improvements are to be partially funded by voter approved bond proceeds. The existing 4" water main has insufficient capacity and a high incidence of water main breaks. The Illinois EPA Public Water Supply Loan Program (PWSLP) is expected to provide loan funding for the water main improvements.

Bidding & Planholders Information

Bidding will be conducted online through the bidding service QuestCDN.

Project Updates

Date
Description
March 28, 2025The project has been advertised for bidding. The bid opening is scheduled for Tuesday, April 15, 2025, at 10:00 a.m., via Microsoft Teams.
February 7, 2025After a pause in design to acquire funding, design is nearing completion. Bidding is expected to take place within the next few months, with construction to tentatively take place is late spring or early summer of 2025, once school is dismissed for summer break.
January 1, 2021Design of the project is well underway. This project is directly related to the Harvard Avenue (Jefferson Park to Plymouth) project that is expected to take place in the Spring of 2021.